4. The laying of a special covering floor ( cement ).

 

  1. Wet the concrete floor.

  2. Sprinkle the cement and rub it in with a soft-haired brush ( allow it to work in for 15 minutes ).

  3. Mix one bag ( 50 gr) of inter master in the mixing water for the cement mortar ( one bag of cement and three bags Rhine or Maas sand ).

  4. Smooth out the mortar.

  • This cement ( covering floor ) hardens quickly and can be applied in temperatures down to -4° C.
  • Gives a high compressive strength to the cement, it's crack- and dust-free. 
  • The floor covering can be applied after approximately 14 days.